Roadmap · 2026
Two quarters, and no dates we cannot keep.
Everything marked shipped is something you can read in the repository today. Everything else is written as a thing to do, not a thing that exists.
- Shipped
- 6
- Building
- 1
- Planned
- 7
Q3 2026
July → September
Build the thing, and say plainly what it is.
- 01
The ve(3,3) core
ShippedEscrow, three-day ballot, gauges with a 1x–2.5x boost, per-round fee and incentive books, a fixed emission pot paying 0.64% of its remainder. 48 checks.
- 02
The range vault
ShippedOne shared Uniswap v3 position per pool, one-sided deposits, a permissionless keeper, fees split by how much of the vault is staked. 31 checks against the real v3 factory bytecode.
- 03
Hardening
ShippedA five-minute price guard on every path that moves money, swaps bounded to 1% from spot, a mutex everywhere, and books that credit what actually arrived.
- 04
One-call claiming
ShippedclaimAll walks the gauges a lock voted for, both books of each, and every asset either was paid in.
- 05
$LATTICE
ShippedThe token is live on Robinhood Chain. The emission pot is bought at launch, not minted.
- 06
The site and the docs
ShippedThe mechanism explained in full, with the numbers the contracts use and a plain statement of what is not deployed.
- 07
Deploy the protocol
BuildingCore and the first vaults to chain 4663, from a script that dry-runs against the live chain before it spends anything. The last thing left this quarter.
Q4 2026
October → December
Run rounds, hand the levers over, and prove it in the open.
- 01
The first rounds
PlannedGauges on the pools that graduated from Pons, emissions following the vote every three days, and the incentive market open to anyone who wants a pool funded.
- 02
The app on live data
PlannedDashboard, vaults, ballot and lock reading the chain instead of fixtures — positions, weights, what a round owes you, and what a vault is quoting right now.
- 03
A keeper anyone can run
PlannedThe bot that settles a closed round and re-centres a drifted vault, published with what it costs and what it pays, so it is not one machine holding the system up.
- 04
Auto-vote, enrolled from the app
PlannedOne approval, revocable without a transaction, and a strategist whose only power is to waste your round.
- 05
Round history, in public
PlannedEvery round: what was voted, what was emitted, what the fees came to, and what each vault paid its voters. The argument for a gauge should be its record.
- 06
External review
PlannedA read of the contracts by someone who did not write them, published whatever it says. No date, because it is not ours to promise.
- 07
Gauges without an operator
PlannedGauge creation moving off the single address it starts on, so a pool does not need us to be worth voting for.
What would change this
Only two things move the second column much: whether the first rounds show real depth arriving where the votes went, and what an outside read of the contracts turns up. Both are findings, not decisions, and this page will say so when they land.